PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

3rd floor Sprinkler raiser Facing North-West.jpg Continued laying out block along the South Elevation rooms Facing East.jpg Erecting Stone panels at the 4th floor East Elevation 1.jpg Erecting Stone panels at the 4th floor East Elevation 2.jpg Installed piping at the 4th floor Facing West.jpg Installing duct work at the 4th floor Facing North.jpg Installing pipe hangers at the 2nd floor Facing West.jpg Interior metal framing at the 3rd floor Facing South-West.jpg Metal framing aroung the 2nd floor roof Facing West.jpg
Previous pageNext page Installed piping at the 4th floor Facing West
Installed piping at the 4th floor Facing West